log [2018/05/29 10:51] – [4th Week Report (18-03-2018)] team4log [2018/06/12 21:34] (current) – [15th meeting (2018-06-14)] team4
Line 16: Line 16:
 After our previous meeting with the teachers we received feedback about our design indicating that it was somewhat bland and unimaginative so this week presenting our most recent idea for our project we showed a more creative design which had more problems than we were equipped to handle in terms of construction and electronic system design. After our previous meeting with the teachers we received feedback about our design indicating that it was somewhat bland and unimaginative so this week presenting our most recent idea for our project we showed a more creative design which had more problems than we were equipped to handle in terms of construction and electronic system design.
  
-==== 5th Week Report (25-03-2018) ====+==== 5th Week Report (19.03.2018 25.03.2018) ====
 Due to our feedback regarding the difficulty of our new more creative design we as a team decided to go back to one of our older ideas and imply update it to be our final design work for the project we are all comfortable to work on. We were also able to construct a cardboard model of our new design and are pleases with how it looks and we feel this is now the best idea to go forward with Due to our feedback regarding the difficulty of our new more creative design we as a team decided to go back to one of our older ideas and imply update it to be our final design work for the project we are all comfortable to work on. We were also able to construct a cardboard model of our new design and are pleases with how it looks and we feel this is now the best idea to go forward with
  
-==== 6th Week Report (01-04-2018) ====+==== 6th Week Report (26.03.2018 - 01.04.2018) ====
 Worked on the structure started to build parts with correct measurements. Also for the prototype all the materials are set and we will start to collect the materials to start building the prototype. Worked on the structure started to build parts with correct measurements. Also for the prototype all the materials are set and we will start to collect the materials to start building the prototype.
  
-==== 7th Week Report (08-04-2018) ====+==== 7th Week Report (02.04.2018 08.04.2018) ====
 This week after being given the idea to use a torsion spring to reduce the amount of motors we would use we made slight adjustments to the structural design. We also worked on assignments in our other classes such as; preparing initial leaflet designs for communications class and identifying possible risks to our project and created tables to illustrate this for us in our project management class. This week after being given the idea to use a torsion spring to reduce the amount of motors we would use we made slight adjustments to the structural design. We also worked on assignments in our other classes such as; preparing initial leaflet designs for communications class and identifying possible risks to our project and created tables to illustrate this for us in our project management class.
  
-==== 8th Week Report ====+==== 8th Week Report (09.04.2018 - 15.04.2018) ====
  
 We learned that our design was not to some of the teacher's liking and that our electric schematics needed to be worked on to be up to a better standard and more acceptable project layout. We also learned that our presentation could benefit from being better rehearsed and for all of us to understand our parts a little more in depth - in particular the electronics. We learned that our design was not to some of the teacher's liking and that our electric schematics needed to be worked on to be up to a better standard and more acceptable project layout. We also learned that our presentation could benefit from being better rehearsed and for all of us to understand our parts a little more in depth - in particular the electronics.
  
-==== 9th Week Report ====+==== 9th Week Report (16.04.2018 - 22.04.2018) ====
  
 After being informed of other components that could be used in our design we researched and applied the use of proximity sensors to our design. We also finalised our list of components and list of local providers for our prototype and submitted this list to the teachers for review. After being informed of other components that could be used in our design we researched and applied the use of proximity sensors to our design. We also finalised our list of components and list of local providers for our prototype and submitted this list to the teachers for review.
  
-==== 10th Week Report ====+==== 10th Week Report (23.04.2018 - 29.04.2018) ====
 **Report is missing** **Report is missing**
  
Line 175: Line 175:
   * Updates to final construction appearance   * Updates to final construction appearance
   * Potential time slots to go to workshop (if available yet)   * Potential time slots to go to workshop (if available yet)
 +
 +=== Minutes: ===
 +We were shown how to include references to our overleaf online paper and reminded of the TEEM deadline for submitting these papers. We were given feedback on our final construction design change for our final product which was briefly mentioned last week. We were also sent an email that included the times available for working the university workshop.
 +
 +==== 13th meeting (2018-05-30) ====
 +
 +=== Agenda: ===
 +
 +  * Further continuation of Overleaf Paper
 +  * Beginnings of construction of our prototype
 +  * Questions and advice on final presentation.
 +
 +==== 14th meeting (2018-06-07) ====
 +
 +=== Agenda: ===
 +
 +  * Overleaf Paper completion
 +  * Further construction of prototype
 +  * Marketing section of Wiki updated and completed
 +
 +==== 15th meeting (2018-06-14) ====
 +
 +  * Updates and improvements to wiki
 +  * Updates and improvements to Overleaf paper
 +  * Upload of functional test results
 +  * Continuation of prototype construction