EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
plan [2017/02/14 16:51] epsatisepplan [2018/06/17 21:03] (current) – [Gantt Chart] team4
Line 3: Line 3:
  
 ===== Deadlines ===== ===== Deadlines =====
- +  2018-02-26 Choose a project proposal and send your choice via email to epsatisep@gmail.com 
-  2017-02-27 Choose a project proposal and send your choice via email to ''epsatisep@gmail.com'' +  * 2018-03-05 Define the Tasks (what must be done - every member should preferably participate in every task), subtask allocation (who does what) and Gantt chart (when) of the project and insert them on the wiki (planning) 
-  * 2017-03-06 Define the Tasks (what must be done - all members must participate in all tasks), subtask allocation (who does what) and Gantt chart (when) of the project and insert them on the wiki (planning)  +  * 2018-03-12 Upload the black box” **System Diagrams & Structural Drafts** to the wiki 
-  * 2017-03-13 Upload the "black box**System Diagrams & Structural Drafts** to the wiki +  * 2018-03-23 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure 
-  * 2017-03-27 Upload the detailed **System Schematics & Structural Drawings** to the wiki and finish the cardboard scale model of the structure +  * 2018-04-04 Upload the **List of Materials (what & quantity)** to the wiki 
-  * 2017-04-03 Upload the **List of Materials (what & quantity)** to the wiki +  * 2018-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters 
-  * 2017-04-09 Upload the Interim Report and Presentation to the wiki. The report must contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters  +  * 2018-04-19 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks 
-  * 2017-04-24 Complete the **List of Materials (local providers & price including VAT and transportation)** to the wiki  +  * 2018-04-23 Complete the **List of Materials (local providers & priceincluding VAT and transportation)** to the wiki 
-  * 2017-04-20 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks +  * 2018-05-02 Upload refined Interim Report (based on Teacher & Supervisor Feedbacks) 
-  * 2017-05-02 Upload refined Interim Report (based on Teacher & Supervisor Feedbacks) +  * 2018-06-04 Upload the results of the **Functional Tests** to the wiki 
-  * 2017-06-05 Upload the **Functional Tests' Results** to the wiki +  * 2018-06-15 Upload the **Final Report** 
-  * 2017-06-18 Upload the Final ReportPresentation, Video, Paper, Poster and Manual +  * 2018-06-18 Upload the **Presentation, Video, Paper, Poster and Manual** 
-  * 2017-06-22 Final Presentation, Individual Discussion and Assessment +  * 2018-06-21 Final Presentation, Individual Discussion and Assessment 
-  * 2017-06-26:  +  * 2018-06-28
-    - Update the wiki with all correction suggestions  +    - Update the wiki with all correction suggestions 
-    - Hand in to the EPS coordinator a CD with the corrected deliverables (source + PDF) together with all code and drawings produced +    - Hand in to the EPS coordinator
-    Hand in one printed exemplar of the corrected report to the EPS coordinator +      - **CD with the corrected deliverables (source + PDF) together with all code and drawings produced** 
-  * 2017-06-29:  +      a **printed copy of the corrected report and poster** 
-    - Hand in the prototype and user manual to the client +  * 2018-06-28
-    - Receive the EPS@ISEP certificate+    - Hand in the **prototype and user manual** to the client 
 +    - Receive the **EPS@ISEP certificate** 
 +    - Bring **typical food** from your country
 ===== Tasks ===== ===== Tasks =====
  
Line 35: Line 37:
  
 ===== Gantt Chart ===== ===== Gantt Chart =====
-{{:gantt_chart.gif|}}+ 
 +{{:first_gantt_chart.docx|}} 
 + 
 +{{ :second_gantt_chart_16-03-2018.docx |}} 
 + 
 +{{ :third_gantt_chart_23-03-2018.docx |}} 
 + 
 +{{ :fourth_gantt_chart_30-03-2018.docx |}} 
 + 
 +{{ ::fifth_gantt_chart_06-04-2018.docx |}} 
 + 
 +{{ ::sixth_gantt_chart_13-04-2018.docx |}} 
 + 
 +{{ ::seventh_gantt_chart_20-04-2018.docx |}} 
 + 
 +{{ ::eighth_gantt_chart_27-04-2018.docx |}} 
 + 
 +{{ ::ninth_gantt_chart_04-05-2018.docx |}} 
 + 
 +{{ ::tenth_gantt_chart_11-05-2018.docx |}} 
 + 
 +{{ ::eleventh_gantt_chart_18-05-2018.docx |}} 
 + 
 +{{ ::twelfth_gantt_chart_25-05-2018.docx |}} 
 + 
 +{{ ::thirteenth_gantt_chart_01-06-2018.docx |}} 
 + 
 +{{ ::fourteenth_gantt_chart_08-06-2018.docx |}} 
 + 
 +{{ :fifteenth_gantt_chart_15-06-2018.docx |}} 
 + 
 +{{ ::microsoft_project_gantt_unzipped.zip |}} 
QR Code
QR Code plan (generated for current page)