Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| plan [2018/02/17 20:38] – [Deadlines] epsatisep | plan [2018/06/17 21:03] (current) – [Gantt Chart] team4 | ||
|---|---|---|---|
| Line 6: | Line 6: | ||
| * 2018-03-05 Define the Tasks (what must be done - every member should preferably participate in every task), subtask allocation (who does what) and Gantt chart (when) of the project and insert them on the wiki (planning) | * 2018-03-05 Define the Tasks (what must be done - every member should preferably participate in every task), subtask allocation (who does what) and Gantt chart (when) of the project and insert them on the wiki (planning) | ||
| * 2018-03-12 Upload the “black box” **System Diagrams & Structural Drafts** to the wiki | * 2018-03-12 Upload the “black box” **System Diagrams & Structural Drafts** to the wiki | ||
| - | * 2018-03-23 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do a **cardboard scale model** of the structure | + | * 2018-03-23 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure |
| - | * 2018-04-03 Upload the **List of Materials (what & quantity)** to the wiki | + | * 2018-04-04 Upload the **List of Materials (what & quantity)** to the wiki |
| * 2018-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the Introduction, | * 2018-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the Introduction, | ||
| * 2018-04-19 Interim Presentation, | * 2018-04-19 Interim Presentation, | ||
| Line 20: | Line 20: | ||
| - Hand in to the EPS coordinator: | - Hand in to the EPS coordinator: | ||
| - a **CD with the corrected deliverables (source + PDF) together with all code and drawings produced** | - a **CD with the corrected deliverables (source + PDF) together with all code and drawings produced** | ||
| - | - a **printed copy of the corrected report** | + | - a **printed copy of the corrected report |
| * 2018-06-28: | * 2018-06-28: | ||
| - Hand in the **prototype and user manual** to the client | - Hand in the **prototype and user manual** to the client | ||
| Line 37: | Line 37: | ||
| ===== Gantt Chart ===== | ===== Gantt Chart ===== | ||
| - | {{:gantt_chart.gif|}} | + | |
| + | {{:first_gantt_chart.docx|}} | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ :: | ||
| + | |||
| + | {{ : | ||
| + | |||
| + | {{ :: | ||