EPS@ISEP | The European Project Semester (EPS) at ISEP


Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
plan [2018/02/17 20:40] – [Deadlines] epsatisepplan [2018/06/17 21:03] (current) – [Gantt Chart] team4
Line 7: Line 7:
   * 2018-03-12 Upload the “black box” **System Diagrams & Structural Drafts** to the wiki   * 2018-03-12 Upload the “black box” **System Diagrams & Structural Drafts** to the wiki
   * 2018-03-23 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure   * 2018-03-23 Upload the detailed **System Schematics & Structural Drawings** to the wiki and do the **cardboard scale model** of the structure
-  * 2018-04-03 Upload the **List of Materials (what & quantity)** to the wiki+  * 2018-04-04 Upload the **List of Materials (what & quantity)** to the wiki
   * 2018-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters   * 2018-04-14 Upload the **Interim Report and Presentation** to the wiki. The report must contain the Introduction, including the tasks, team members allocation and Gantt chart, State of the Art, Marketing Plan, Project Management, Eco-eficiency Measures for Sustainability, Ethical and Deontological Concerns, Proposed Solution and Bibliography chapters
   * 2018-04-19 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks   * 2018-04-19 Interim Presentation, Discussion and Peer, Teacher and Supervisor Feedbacks
Line 37: Line 37:
  
 ===== Gantt Chart ===== ===== Gantt Chart =====
-{{:gantt_chart.gif|}}+ 
 +{{:first_gantt_chart.docx|}} 
 + 
 +{{ :second_gantt_chart_16-03-2018.docx |}} 
 + 
 +{{ :third_gantt_chart_23-03-2018.docx |}} 
 + 
 +{{ :fourth_gantt_chart_30-03-2018.docx |}} 
 + 
 +{{ ::fifth_gantt_chart_06-04-2018.docx |}} 
 + 
 +{{ ::sixth_gantt_chart_13-04-2018.docx |}} 
 + 
 +{{ ::seventh_gantt_chart_20-04-2018.docx |}} 
 + 
 +{{ ::eighth_gantt_chart_27-04-2018.docx |}} 
 + 
 +{{ ::ninth_gantt_chart_04-05-2018.docx |}} 
 + 
 +{{ ::tenth_gantt_chart_11-05-2018.docx |}} 
 + 
 +{{ ::eleventh_gantt_chart_18-05-2018.docx |}} 
 + 
 +{{ ::twelfth_gantt_chart_25-05-2018.docx |}} 
 + 
 +{{ ::thirteenth_gantt_chart_01-06-2018.docx |}} 
 + 
 +{{ ::fourteenth_gantt_chart_08-06-2018.docx |}} 
 + 
 +{{ :fifteenth_gantt_chart_15-06-2018.docx |}} 
 + 
 +{{ ::microsoft_project_gantt_unzipped.zip |}} 
QR Code
QR Code plan (generated for current page)